08 250 sits in the mist en route to Doncaster Works for repair.
08 250 sits in the mist en route to Doncaster Works for repair.
22nd November 1984 00:00
MARCH DEPOT
FENLAND RAILWAY FOTOS @ fotopic.net
40 079 is only 2 months away from withdrawal as it sits on depot.Previous | NextA rake of LNER-built Class 306 EMU's awaits despatch to the flame tunnel at Snailwell in the old steam shed sidings.

Added on 6th March 2007, has been viewed 83 times
(2 this year, 2 this month, 2 this week, 1 today)